At Miguel Capintero S.L., based in the province of Girona, we are committed to new ways of building through the Steel Framing system, an industrialized construction system with a galvanized steel structure that allows totally tailor-made projects, with high precision, speed of execution and energy efficiency.
CUSTOM DESIGN
Total freedom of architectural design
FAST EXECUTION
Significant reduction in work time
HIGH PRECISION
Industrialized system with total control
EFFICIENCY AND SUSTAINABILITY
Efficient and responsible construction
GALVANIZED STEEL
Lightweight structure of high strength S280GD and galvanized Z27R
Constructive Detail
30.5 cm total thickness
Acrylic render
Base render
Mesh 160
Lightweight cement board
Breathable waterproof membrane
OSB class 3 board
Anti-impact membrane
Thermal Insulation 1
Double fire-resistant gypsum board
Thermal Insulation 2
Plumbing installation
Electrical installation
Gypsum board
Tap an element to see it in detail
Phases of the Construction System
Preliminary Study and Technical Design
01.
Topographic Study
The topographic study serves to establish sizes, distances and the relief of the terrain projected on a plan.
02.
Geotechnical
Studying the geological composition of the land is
essential and key to designing the most suitable foundation for building safely and also to adjust the cost of construction.
03.
Architectural Project, Construction Management, Quality Control and Health and Safety Coordination
The basic and executive projects containing all the description, calculations and justifications of compliance with regulations, as well as the measurements necessary for the execution of the work. These are essential requirements for the submission of any application for a building permit to a city council.
Miguel Carpintero S.L. includes the basic and executive projects, the structural engineering study, the health and safety study, the health and safety plan and the collegiate project visa expenses, as well as the designation of site manager, site execution director, quality control officer and health and safety coordinator.
04.
Excavation
The clearing, cleaning and leveling of the land are essential for construction.
Foundation and structure
05.
Foundations
Depending on the result of the geotechnical study, an appropriate development must be carried out on the existing land in compliance with the technical building code .
06.
Structure
Miguel Carpintero S.L., builds with Steel Framing technology. The structure is made of high-strength structural light steel S280GD and galvanized Z275, with a tensile strength of 3700kg/cm2, according to the European Standard.
EN1090-1+A1:2011 and with the AENOR certificate, they can reach up to 4 floors in height. The relevant engineering calculation is included.
07.
Cover
The roof may be flat or sloping formed by Steel Framing technology. The structure is made with 30 cm mineral wool insulation + 6cm XPS, total 36 cm of insulation, waterproofing and gravel finishing on protected asphalt fabric.
08.
Façade
The Steel Framing system allows you to choose between different systems and finishes of facades, acrylic mortar, ventilated façade, etc…
All of them achieve a low thermal transmittance that allows them to obtain the Class A Energy Certification and the option of the Passive House Certification.
11.
Stairs
The execution of the stairs is created with a Steel Framing light steel structure finished with porcelain, parquet…
and a stainless steel railing, glass…
10.
Interior partitions and Ceilings
All interior partitions and ceilings will be made with prefabricated laminated plasterboard plates or panels flipped and screwed to a metal structure of mounts and channels.
The relevant acoustic and thermal insulation is included.
09.
Windows and Exterior Enclosures
White aluminium windows/balconies with RPT are included, with 4+4/16/3+3 low-emission glass and solar control.
They will be sliding, practicable or swinging all according to the needs of the project.
12.
Interior Flooring
Porcelain or parquet finish to choose from various models and manufacturers.
Finishes and details
13.
Kitchen
The kitchen is a space where everyone participates, so it must be pleasant, comfortable, practical and bright according to the design of each project.
14.
Bathrooms
The bathrooms will be equipped with toilets, bathroom furniture, shower tray or bathtub
, screen offering different models to choose from.
15.
Doors
Interior doors must be part of a pleasant and comfortable space that will be smooth or decorated, white lacquered or made of smooth wood veneer with handles to choose from different models.
16.
Sanitation Installation
All the necessary facilities for compliance with the Technical Building Code for the proper evacuation of wastewater and rainwater are included.
17.
Plumbing Installation
All the facilities necessary for compliance with the Code are included.
Building technician for the correct water supply in the kitchen, bathrooms…
18.
Electrical Installation
It includes all the electrical installations necessary to obtain a high degree of electrification, up to a maximum power of 9200 watts and 40 amps, according to ICT-BT-25 of the low voltage electrotechnical regulations.
All mechanisms will be of the JUNG LS 990 brand.
19.
Installation of Heating
and Domestic Hot Water
It includes the installation of aerothermal energy for underfloor heating, and the generation of domestic hot water , with 1st
generation machinery.
20.
Mechanical Ventilation Installation
It includes an air renewal system with a heat exchanger that allows you to renew the air we breathe with a high performance of 96% and low consumption. (In compliance with the provisions of the Technical Building Code).
21.
Painting
The painting of walls and ceilings is the finishing coating of the house.
22.
Landscaping Project
We study the land, the house and the appreciations of the clients and offer proposals for garden design, Mediterranean gardens, Japanese, Zen… We work with water and nature.